IAC logo
IAC Assessment: LM0037
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0037
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2002
Principal Product thermal processing
NAICS n/a
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 48
Plant Area (Sq.Ft.) 20,000
Annual Production 5,850,000 Pounds
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $364,474 4,339,980 kWh $0.08
Electricity Demand $139,613 12,072 kW-months/year $11.57
Electricity Fees $23,780 - $ -
Natural Gas $145,141 20,242 MMBtu $7.17
TOTAL ENERGY COSTS $673,008
RECOMMENDED SAVINGS* $100,514 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,259
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,266
Cost:
$1,050
$1,018 7,667 $248 46 - - - - - - $1,018
7,667
kWh
$248
46
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,665
Cost:
$2,150
$1,478 12,813 $187 23 - - - - - - $1,478
12,813
kWh
$187
23
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,259
Cost:
$1,700
- - $4,935 - $3,324 - - - - - -
-
kWh
$4,935
-
kW-months/year
$3,324
-
$
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$24,595
Cost:
$27,000
- - - - - - $24,595 2,745 - - -
-
kWh
-
-
kW-months/year
-
-
$
$24,595
2,745
MMBtu
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,908
Cost:
$306
- - - - - - $1,908 213 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,908
213
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$755
Cost:
$224
$755 7,040 - - - - - - - - $755
7,040
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$45,000
Cost:
$40,000
- - - - - - - - $45,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$45,000
-
$
08: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$17,066
Cost:
$14,227
- - - - - - - - $17,066 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$17,066
-
$
TOTAL RECOMMENDED Savings:
$100,514
Cost:
$86,657
$3,251 27,520 $5,370 69 $3,324 - $26,503 2,958 $62,066 - $3,251
27,520
kWh
$5,370
69
kW-months/year
$3,324
-
$
$26,503
2,958
MMBtu
$62,066
-
$
TOTAL IMPLEMENTED Savings:
$8,259
Cost:
$1,700
- - $4,935 - $3,324 - - - - - -
-
kWh
$4,935
-
kW-months/year
$3,324
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product