Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

936

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0022 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,734 $100 Implemented
LM0022 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,848 $164 Not Implemented
LM0022 # 03 Y:2001 03 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $54,047 $450 Implemented
LM0022 # 04 Y:2001 04 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,008 $15,300 Not Implemented
LM0022 # 05 Y:2001 05 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $57,000 $102,000 Implemented
LM0015 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,371 $19,200 Implemented
LM0015 # 02 Y:2001 02 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,951 $550 Implemented
LM0015 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,264 $800 Implemented
LM0015 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,982 $0 Not Implemented
LM0015 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,965 $12,950 Not Implemented
LM0015 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $100,699 $450 Not Implemented
LM0015 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,944 $11,800 Implemented
LM0015 # 08 Y:2001 08 2001 SCHEDULE DELIVERIES ACCORDING TO DEMAND $207,000 $1,000 Not Implemented
LM0015 # 09 Y:2001 09 2001 CONTRACT OUT MAINTENANCE $7,300 $0 Implemented
LM0015 # 10 Y:2001 10 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $104,000 $24,000 Implemented
LM0016 # 01 Y:2001 01 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $9,494 $2,500 Not Implemented
LM0016 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $50,600 $60,000 Not Implemented
LM0016 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,311 $3,335 Implemented
LM0016 # 04 Y:2001 04 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $18,720 $15,300 n/a
LM0016 # 05 Y:2001 05 2001 DEVELOP STANDARD OPERATING PROCEDURES $1,482,000 $5,000 Implemented
LM0016 # 06 Y:2001 06 2001 DEVELOP STANDARD OPERATING PROCEDURES $340,000 $310,000 Implemented
LM0014 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $149 $145 n/a
LM0014 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,545 $250 n/a
LM0014 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $189 $300 n/a
LM0014 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $4,883 $263 n/a