IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2114 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $423 $155 Not Implemented
LS2114 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,124 $270 Implemented
LS2114 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $495 $25 Not Implemented
LS2114 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,117 $473 Implemented
LS2114 # 04 Y:2021 04 2021 USE PHOTOCELL CONTROLS $813 $148 Implemented
LS2114 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,312 $113 Implemented
LS2114 # 07 Y:2021 07 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $66 $50 Not Implemented
LS2114 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $55 $102 Not Implemented
LS2113 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,876 $16,200 Not Implemented
LS2113 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $2,236 $646 Not Implemented
LS2113 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,491 $585 Implemented
LS2113 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,312 $318 Not Implemented
LS2113 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,608 $50 Not Implemented
LS2113 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,512 $6,847 Implemented
LS2009 # 01 Y:2020 01 2020 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $209 $13 Not Implemented
LS2009 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,136 $360 Implemented
LS2009 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $155 $25 Not Implemented
LS2009 # 04 Y:2020 04 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $71 $50 Implemented
LS2009 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $69 $88 Implemented
LS2009 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,426 $2,260 Implemented
LS2009 # 07 Y:2020 07 2020 INSTALL AUTOMATIC PACKING EQUIPMENT $57,969 $120,000 Implemented
LS2009 # 08 Y:2020 08 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,664 $14,000 Not Implemented
LS1908 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $257,815 $4,915,152 Not Implemented
LS1908 # 05 Y:2019 05 2019 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $46,800 $30,000 Implemented
LS1908 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,396 $21,120 Implemented