Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
493
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8370 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,034 | $0 | n/a |
LT8370 # 03 Y:2023 | 03 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $24,363 | $0 | n/a |
LT8370 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,864 | $8,022 | n/a |
LT8369 # 01 Y:2022 | 01 | 2022 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,717 | $30,030 | n/a |
LT8369 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,592 | $12,831 | n/a |
LT8369 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $4,568 | $3,852 | n/a |
LT8368 # 01 Y:2022 | 01 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,357 | $5,022 | Not Implemented |
LT8368 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $952 | $3,400 | Not Implemented |
LT8368 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $585 | $852 | Implemented |
LT8362 # 01 Y:2022 | 01 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $673 | $0 | n/a |
LT8362 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,493 | $30,000 | n/a |
LT8362 # 03 Y:2022 | 03 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,079 | $0 | n/a |
LT8362 # 04 Y:2022 | 04 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $808 | $29,000 | n/a |
LT8362 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $10,089 | $0 | n/a |
LT8362 # 06 Y:2022 | 06 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,938 | $0 | n/a |
LT8362 # 07 Y:2022 | 07 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $223 | $180 | n/a |
LT0144 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,927 | $0 | Implemented |
LT0144 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34 | $17 | Implemented |
LT0144 # 03 Y:1989 | 03 | 1989 | INSTALL SET-BACK TIMERS | $1,494 | $0 | Implemented |
LT0138 # 01 Y:1988 | 01 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $648 | $1,801 | Not Implemented |
LT0138 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $320 | $0 | Implemented |
LT0138 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $336 | $154 | Not Implemented |
LT0138 # 04 Y:1988 | 04 | 1988 | INSTALL SET-BACK TIMERS | $150 | $206 | Implemented |
LT0140 # 01 Y:1988 | 01 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $4,045 | $1,350 | Implemented |
LT0140 # 02 Y:1988 | 02 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $635 | $960 | Not Implemented |