IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0078 # 01 Y:1986 01 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,650 $2,760 Implemented
MA0080 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,100 $3,000 Implemented
MA0078 # 06 Y:1986 06 1986 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,610 $22,000 Implemented
MA0080 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $44,537 $600 Implemented
MA0078 # 05 Y:1986 05 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $827 $240 Implemented
MA0079 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,763 $4,700 Implemented
MA0079 # 02 Y:1986 02 1986 REPAIR OR REPLACE STEAM TRAPS $4,572 $600 Implemented
MA0078 # 03 Y:1986 03 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,530 $3,500 Implemented
MA0079 # 01 Y:1986 01 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $478 $350 Implemented
MA0079 # 05 Y:1986 05 1986 USE OPTIMUM THICKNESS INSULATION $21,098 $5,000 Implemented
MA0076 # 05 Y:1986 05 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $882 $3,588 Implemented
MA0076 # 01 Y:1986 01 1986 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $3,524 $6,000 Implemented
MA0075 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $565 $1,136 Implemented
MA0076 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $77 Implemented
MA0075 # 06 Y:1986 06 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $789 $800 Implemented
MA0075 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,134 $1,075 Implemented
MA0075 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,271 $119 Implemented
MA0075 # 08 Y:1986 08 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,014 $7,500 Implemented
MA0072 # 04 Y:1986 04 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,691 $720 Implemented
MA0074 # 01 Y:1986 01 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,075 $1,200 Implemented
MA0071 # 08 Y:1986 08 1986 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,104 $6,688 Implemented
MA0072 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,992 $6,740 Implemented
MA0072 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $34,923 $1,500 Implemented
MA0074 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $158 $100 Implemented
MA0071 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $126,986 $6,650 Implemented