Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0460 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $69,572 | $286,600 | Not Implemented |
MA0460 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $22,135 | $42,000 | Not Implemented |
MA0460 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,240 | $26,115 | Not Implemented |
MA0460 # 04 Y:2000 | 04 | 2000 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $5,388 | $13,800 | Implemented |
MA0460 # 05 Y:2000 | 05 | 2000 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $4,828 | $1,960 | Implemented |
MA0460 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,880 | $32,900 | Implemented |
MA0460 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,435 | $300 | Implemented |
MA0460 # 08 Y:2000 | 08 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $1,070 | Implemented |
MA0460 # 09 Y:2000 | 09 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $815 | $3,075 | Not Implemented |
MA0460 # 10 Y:2000 | 10 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $815 | $300 | Implemented |
MA0463 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $203,441 | $1,320,000 | Not Implemented |
MA0463 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,420 | $120,000 | Implemented |
MA0463 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,123 | $12,075 | Not Implemented |
MA0463 # 04 Y:2000 | 04 | 2000 | OPTIMIZE PLANT POWER FACTOR | $3,291 | $9,600 | Not Implemented |
MA0463 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,745 | $4,317 | Implemented |
MA0463 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $240 | $420 | Implemented |
MA0464 # 01 Y:2000 | 01 | 2000 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $15,077 | $36,000 | Not Implemented |
MA0464 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $193 | $0 | Implemented |
MA0464 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $145 | $440 | Implemented |
MA0462 # 01 Y:2000 | 01 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $961,067 | $880,000 | Not Implemented |
MA0462 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $194,677 | $430,350 | Not Implemented |
MA0462 # 03 Y:2000 | 03 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $113,014 | $750,000 | Not Implemented |
MA0462 # 04 Y:2000 | 04 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,632 | $31,000 | Implemented |
MA0462 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $13,500 | $6,000 | Implemented |
MA0462 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,580 | $17,000 | Implemented |