IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0426 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $9,368 $24,200 Not Implemented
MA0426 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $586 $458 Implemented
MA0426 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $623 $25 Implemented
MA0426 # 04 Y:1998 04 1998 USE RADIANT HEATER FOR SPOT HEATING $902 $1,975 Not Implemented
MA0426 # 05 Y:1998 05 1998 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $2,320 $9,100 Not Implemented
MA0424 # 01 Y:1998 01 1998 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $263,073 $1,000,000 Not Implemented
MA0424 # 02 Y:1998 02 1998 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,538 $30,400 Implemented
MA0424 # 03 Y:1998 03 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,197 $21,808 Not Implemented
MA0424 # 04 Y:1998 04 1998 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $12,411 $10,638 Not Implemented
MA0424 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,568 $0 Implemented
MA0424 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,474 $5,800 Not Implemented
MA0419 # 01 Y:1998 01 1998 COVER OPEN TANKS $168,295 $5,000 Implemented
MA0419 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,360 $118,235 Implemented
MA0419 # 03 Y:1998 03 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $36,192 $201,500 Not Implemented
MA0419 # 04 Y:1998 04 1998 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $10,000 $3,120 Implemented
MA0419 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,822 $9,000 Implemented
MA0419 # 06 Y:1998 06 1998 PAY BILLS ON TIME TO AVOID LATE FEES $3,967 $0 Implemented
MA0419 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,739 $0 Implemented
MA0419 # 08 Y:1998 08 1998 OPTIMIZE PLANT POWER FACTOR $2,539 $7,125 Not Implemented
MA0425 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,172 $146,000 Not Implemented
MA0425 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,915 $160,000 Not Implemented
MA0425 # 03 Y:1998 03 1998 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $264,206 $700,000 Not Implemented
MA0425 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,206 $104,150 Not Implemented
MA0425 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,320 $1,650 Not Implemented
MA0425 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,093 $14,700 Not Implemented