IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0410 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,796 $11,700 n/a
MA0410 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,014 $4,925 n/a
MA0410 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,403 $4,925 n/a
MA0410 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,895 $3,400 n/a
MA0410 # 06 Y:1998 06 1998 PAY BILLS ON TIME TO AVOID LATE FEES $2,746 $0 n/a
MA0410 # 07 Y:1998 07 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,030 $236 n/a
MA0410 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $514 $626 n/a
MA0410 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,484 $7,225 n/a
MA0406 # 01 Y:1998 01 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,022 $200 Implemented
MA0406 # 02 Y:1998 02 1998 UPGRADE CONTROLS ON COMPRESSORS $3,950 $1,785 Not Implemented
MA0406 # 03 Y:1998 03 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,323 $187 Implemented
MA0406 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $802 $541 Implemented
MA0406 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,955 $2,332 Not Implemented
MA0406 # 06 Y:1998 06 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,045 $14,790 Not Implemented
MA0406 # 07 Y:1998 07 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,468 $24,000 Implemented
MA0406 # 08 Y:1998 08 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,070 $13,540 Not Implemented
MA0407 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,744 $16,729 Not Implemented
MA0407 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,468 $100 Implemented
MA0407 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $52 Implemented
MA0408 # 01 Y:1998 01 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $99,832 $87,100 Not Implemented
MA0408 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,625 $8,625 Not Implemented
MA0408 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,188 $1,000 Implemented
MA0408 # 04 Y:1998 04 1998 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,939 $5,520 Not Implemented
MA0408 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,735 $100 Implemented
MA0408 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,487 $2,675 Not Implemented