IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0408 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $644 $513 Implemented
MA0408 # 08 Y:1998 08 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,232 $250,000 Implemented
MA0405 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $110,455 $131,100 Not Implemented
MA0405 # 02 Y:1997 02 1997 MINIMIZE WATER USAGE $25,165 $3,413 Implemented
MA0405 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,177 $28,900 Implemented
MA0405 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,631 $266 Not Implemented
MA0405 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $2,412 $5,275 Not Implemented
MA0405 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $1,335 $1,620 Implemented
MA0405 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $1,049 $2,125 Not Implemented
MA0405 # 08 Y:1997 08 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $531 $600 Not Implemented
MA0404 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $412,115 $1,000,000 Implemented
MA0404 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,416 $16,505 Not Implemented
MA0404 # 03 Y:1997 03 1997 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,933 $71,400 Implemented
MA0404 # 04 Y:1997 04 1997 USE OTHER METHODS FOR NEUTRALIZATION $34,200 $0 Not Implemented
MA0404 # 05 Y:1997 05 1997 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $0 $0 Implemented
MA0403 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $57,769 $221,193 Not Implemented
MA0403 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,467 $41,542 Implemented
MA0403 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $7,904 $4,620 Implemented
MA0403 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,578 $19,800 Not Implemented
MA0403 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,118 $5,000 Not Implemented
MA0403 # 06 Y:1997 06 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $970 $900 Not Implemented
MA0403 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $0 Not Implemented
MA0402 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $217,449 $140,000 Not Implemented
MA0402 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $61,092 $16,597 Not Implemented
MA0402 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,628 $6,075 Not Implemented