IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0341 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $469 $400 Implemented
MA0342 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $10,527 $8,100 Implemented
MA0342 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,510 $0 Not Implemented
MA0342 # 03 Y:1995 03 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,090 $25,000 Not Implemented
MA0342 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,836 $0 Implemented
MA0342 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,525 $3,443 Implemented
MA0342 # 06 Y:1995 06 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,705 $7,770 Not Implemented
MA0342 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,776 $725 Not Implemented
MA0342 # 08 Y:1995 08 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $797 $0 Implemented
MA0342 # 09 Y:1995 09 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $547 $1,500 Not Implemented
MA0342 # 10 Y:1995 10 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $326 $711 Not Implemented
MA0338 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,008 $0 Implemented
MA0338 # 02 Y:1995 02 1995 USE RADIANT HEATER FOR SPOT HEATING $3,469 $9,200 Implemented
MA0338 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,970 $0 Implemented
MA0338 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,592 $1,000 Implemented
MA0338 # 05 Y:1995 05 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $617 $711 Not Implemented
MA0338 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $396 $289 Implemented
MA0336 # 01 Y:1995 01 1995 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,427 $0 Implemented
MA0336 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $854 $2,191 Not Implemented
MA0336 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $580 Implemented
MA0336 # 04 Y:1995 04 1995 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $582 $0 Implemented
MA0336 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $461 $0 Implemented
MA0337 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,934 $44,000 Implemented
MA0337 # 02 Y:1995 02 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,708 $5,000 Not Implemented
MA0337 # 03 Y:1995 03 1995 ELIMINATE THIRD SHIFT $4,455 $0 Not Implemented