IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0310 # 07 Y:1994 07 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,505 $2,697 Implemented
MA0310 # 08 Y:1994 08 1994 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,800 $0 Implemented
MA0316 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $21,512 $16,194 Not Implemented
MA0316 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,576 $0 Implemented
MA0316 # 03 Y:1994 03 1994 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,905 $629 Not Implemented
MA0316 # 04 Y:1994 04 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,618 $685 Implemented
MA0316 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $1,426 $1,789 Not Implemented
MA0316 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $1,389 $2,700 Not Implemented
MA0316 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $475 $312 Implemented
MA0313 # 01 Y:1994 01 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $16,573 $31,939 Not Implemented
MA0313 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,198 $30,000 Not Implemented
MA0313 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,706 $2,248 Implemented
MA0313 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,203 $28,535 Not Implemented
MA0313 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $180 Implemented
MA0313 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $69,505 $30,000 Implemented
MA0313 # 07 Y:1994 07 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $25,107 $30,000 Not Implemented
MA0313 # 08 Y:1994 08 1994 REDUCE OR ELIMINATE WASTE $386 $500 Implemented
MA0312 # 01 Y:1994 01 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,799 $2,827 Not Implemented
MA0312 # 02 Y:1994 02 1994 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $4,017 $80,000 Implemented
MA0312 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,870 $6,854 Not Implemented
MA0312 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $372 $1,094 Implemented
MA0312 # 05 Y:1994 05 1994 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,394 $35,728 Implemented
MA0312 # 06 Y:1994 06 1994 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,280 $700 Not Implemented
MA0315 # 01 Y:1994 01 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $10,053 $33,627 Not Implemented
MA0315 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,672 $3,805 Not Implemented