IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0045 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $756 $750 Implemented
MA0045 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,100 $5,110 Not Implemented
MA0045 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,515 $2,816 Not Implemented
MA0045 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $4,896 $7,546 Not Implemented
MA0045 # 06 Y:1985 06 1985 REPAIR OR REPLACE STEAM TRAPS $661 $500 Implemented
MA0045 # 07 Y:1985 07 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $573 $11 Implemented
MA0045 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $546 $1,329 Not Implemented
MA0045 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $845 $1,100 Implemented
MA0046 # 01 Y:1985 01 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $738 $1,650 Not Implemented
MA0046 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $74 Implemented
MA0046 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,418 $168 Not Implemented
MA0046 # 04 Y:1985 04 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $924 $1,350 Not Implemented
MA0046 # 05 Y:1985 05 1985 OPTIMIZE PLANT POWER FACTOR $776 $1,875 Not Implemented
MA0047 # 01 Y:1985 01 1985 UPGRADE OBSOLETE EQUIPMENT $11,304 $0 Implemented
MA0047 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,175 $821 Implemented
MA0047 # 03 Y:1985 03 1985 HEAT WATER WITH EXHAUST HEAT $1,144 $2,804 Implemented
MA0047 # 04 Y:1985 04 1985 REPAIR OR REPLACE STEAM TRAPS $16,278 $715 Implemented
MA0047 # 05 Y:1985 05 1985 INSTALL TIMERS AND/OR THERMOSTATS $3,640 $2,000 Implemented
MA0040 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,976 $253 Implemented
MA0040 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,275 $0 Implemented
MA0040 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $88 $0 Not Implemented
MA0040 # 04 Y:1985 04 1985 INSTALL SET-BACK TIMERS $285 $97 Implemented
MA0041 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,442 $2,640 Implemented
MA0041 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,972 $9,826 Implemented
MA0041 # 03 Y:1985 03 1985 AIR CONDITION ONLY SPACE NECESSARY $16,180 $17,180 Not Implemented