IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,929

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0689 # 15 Y:2012 15 2012 INSULATE BARE EQUIPMENT $1,579 $2,300 Implemented
MA0689 # 16 Y:2012 16 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,244 $1,000 Implemented
MA0689 # 17 Y:2012 17 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,042 $500 Implemented
MA0689 # 18 Y:2012 18 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $717 $200 Implemented
MAS019 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,186 $1,500 Implemented
MAS019 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $2,999 $1,535 Not Implemented
MAS019 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,233 $2,507 Not Implemented
MAS019 # 04 Y:2012 04 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,117 $0 Implemented
MAS019 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $375 $0 Implemented
MA0690 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $3,246 $1,750 Implemented
MA0690 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,986 $7,500 Not Implemented
MA0690 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,892 $4,075 Implemented
MA0690 # 04 Y:2012 04 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,582 $4,075 Not Implemented
MA0688 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $22,622 $21,500 Not Implemented
MA0688 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $10,004 $9,352 Implemented
MA0688 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,644 $2,250 Implemented
MA0688 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,988 $1,800 Not Implemented
MA0688 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,762 $15,050 Not Implemented
MA0688 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,689 $4,605 Implemented
MAS017 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,566 $10,000 Implemented
MAS017 # 02 Y:2012 02 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,892 $15,000 Not Implemented
MAS017 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $511 $200 Not Implemented
MAS016 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,510 $5,600 Implemented
MAS016 # 02 Y:2012 02 2012 RECOVER AND REUSE COOLING WATER $79 $375 Not Implemented
MAS016 # 03 Y:2012 03 2012 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,910 $0 Implemented