IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,929

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0439 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $4,578 $10,705 Not Implemented
MA0439 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,295 Implemented
MA0439 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,116 $3,400 Not Implemented
MA0439 # 07 Y:1999 07 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $668 $1,244 Not Implemented
MA0437 # 01 Y:1999 01 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $17,316 $3,000 Not Implemented
MA0437 # 02 Y:1999 02 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $8,292 $1,892 Not Implemented
MA0437 # 03 Y:1999 03 1999 UPGRADE CONTROLS ON COMPRESSORS $6,214 $400 Implemented
MA0437 # 04 Y:1999 04 1999 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $2,225 $300 Implemented
MA0437 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,451 $2,445 Implemented
MA0437 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $774 $0 Implemented
MA0434 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $3,090 $8,125 Not Implemented
MA0434 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $652 $2,185 Not Implemented
MA0434 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $230 $130 Implemented
MA0434 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $71 $50 Implemented
MA0432 # 01 Y:1999 01 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $9,010 $21,612 Not Implemented
MA0432 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,201 $18,690 Implemented
MA0432 # 03 Y:1999 03 1999 USE RADIANT HEATER FOR SPOT HEATING $6,592 $40,000 Implemented
MA0432 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,735 $13,320 Not Implemented
MA0432 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,836 $0 Implemented
MA0432 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $1,451 Implemented
MA0432 # 07 Y:1999 07 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $681 $0 Implemented
MA0432 # 08 Y:1999 08 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $428 $200 Implemented
MA0432 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $30 Implemented
MA0431 # 01 Y:1999 01 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $9,010 $21,612 Not Implemented
MA0431 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,201 $18,690 Implemented