IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0514 # 04 Y:2002 04 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,569 $0 Implemented
MA0514 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,407 $0 Not Implemented
MA0514 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,214 $500 Implemented
MA0514 # 07 Y:2002 07 2002 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $519 $900 Not Implemented
MA0514 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $214 $262 Not Implemented
MA0514 # 09 Y:2002 09 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $177 $281 Implemented
MA0512 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,408 $75,000 Not Implemented
MA0512 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $29,628 $24,650 Not Implemented
MA0512 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $1,000 Implemented
MA0512 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,144 $170 Implemented
MA0511 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $38,495 $4,090 Implemented
MA0511 # 02 Y:2002 02 2002 APPLY FOR INVESTMENT INCENTIVES $15,314 $0 Implemented
MA0511 # 03 Y:2002 03 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,764 $14,100 Implemented
MA0511 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,282 $6,950 Implemented
MA0511 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $605 $0 Implemented
MA0511 # 06 Y:2002 06 2002 PAY BILLS ON TIME TO AVOID LATE FEES $483 $0 Implemented
MA0511 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $249 $0 Implemented
MA0511 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $86 $350 Implemented
MA0506 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,554 $9,225 Implemented
MA0506 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,604 $13,500 Not Implemented
MA0506 # 03 Y:2002 03 2002 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $3,778 $0 Not Implemented
MA0506 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,391 $1,102 Implemented
MA0506 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,289 $1,100 Implemented
MA0506 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $982 $3,275 Implemented
MA0509 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $21,321 $60,800 Not Implemented