IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,498

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0215 # 08 Y:1997 08 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $488 $215 Implemented
ME0215 # 09 Y:1997 09 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,790 $10,531 Not Implemented
ME0214 # 01 Y:1997 01 1997 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $24,500 $7,500 Implemented
ME0214 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,079 $31,719 Implemented
ME0214 # 03 Y:1997 03 1997 PURCHASE APPROPRIATELY SIZED MATERIAL $4,000 $2,840 Implemented
ME0214 # 04 Y:1997 04 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,400 $800 Not Implemented
ME0214 # 05 Y:1997 05 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,351 $0 Implemented
ME0214 # 06 Y:1997 06 1997 USE OPTIMUM THICKNESS INSULATION $816 $75 Implemented
ME0214 # 07 Y:1997 07 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $604 $0 Not Implemented
ME0214 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $30 Implemented
ME0214 # 09 Y:1997 09 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $832 $6,200 Implemented
ME0214 # 10 Y:1997 10 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,432 $6,200 Not Implemented
ME0212 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,180 $12,500 Implemented
ME0212 # 02 Y:1997 02 1997 COVER OPEN TANKS $6,034 $6,233 Not Implemented
ME0212 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,766 $13,215 Implemented
ME0212 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,098 $12,016 Implemented
ME0212 # 05 Y:1997 05 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,178 $1,632 Implemented
ME0212 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $1,570 $980 Implemented
ME0212 # 07 Y:1997 07 1997 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $849 $439 Implemented
ME0212 # 08 Y:1997 08 1997 REPAIR AND ELIMINATE STEAM LEAKS $8,286 $9,600 Not Implemented
ME0212 # 09 Y:1997 09 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,950 $5,000 Not Implemented
ME0211 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $75,038 $50,000 Not Implemented
ME0211 # 02 Y:1997 02 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $69,013 $29,900 Not Implemented
ME0211 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,750 $6,940 Not Implemented
ME0211 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,941 $6,269 Implemented