IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,498

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0292 # 13 Y:2000 13 2000 SELL COMBUSTIBLE WASTE $4,000 $12,000 Not Implemented
ME0292 # 12 Y:2000 12 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,700 $9,500 Not Implemented
ME0292 # 11 Y:2000 11 2000 USE OPTIMUM THICKNESS INSULATION $34 $72 Not Implemented
ME0292 # 10 Y:2000 10 2000 INSULATE FEEDWATER TANK $173 $183 Not Implemented
ME0292 # 09 Y:2000 09 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $264 $380 Not Implemented
ME0292 # 08 Y:2000 08 2000 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $310 $240 Implemented
ME0292 # 07 Y:2000 07 2000 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $827 $250 Not Implemented
ME0292 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,025 $1,373 Not Implemented
ME0292 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,944 $5,571 Not Implemented
ME0292 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,822 $340 Implemented
ME0292 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,527 $9,000 Not Implemented
ME0292 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,056 $26,450 Not Implemented
ME0292 # 01 Y:2000 01 2000 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,365 $13,000 Not Implemented
ME0290 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59,165 $59,168 Not Implemented
ME0290 # 02 Y:2000 02 2000 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $48,618 $10,860 Not Implemented
ME0290 # 03 Y:2000 03 2000 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,732 $1,800 Implemented
ME0290 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,000 Implemented
ME0290 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,685 $2,475 Implemented
ME0290 # 06 Y:2000 06 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,750 $9,000 Not Implemented
ME0290 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $74,857 $270,000 Not Implemented
ME0290 # 08 Y:2000 08 2000 MOVE PRODUCT USING MECHANICAL MEANS $26,063 $13,600 Implemented
ME0291 # 08 Y:2000 08 2000 BURN WOOD BY-PRODUCTS FOR HEAT $28,257 $53,000 Not Implemented
ME0291 # 07 Y:2000 07 2000 INSTALL TIMERS AND/OR THERMOSTATS $67 $100 Not Implemented
ME0291 # 05 Y:2000 05 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $790 $750 Not Implemented
ME0291 # 06 Y:2000 06 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $694 $160 Implemented