IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,498

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0131 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,084 $7,000 Not Implemented
ME0131 # 02 Y:1994 02 1994 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $690,090 $1,600,000 Not Implemented
ME0131 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,130 $41,000 Not Implemented
ME0131 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,786 $900 Not Implemented
ME0129 # 01 Y:1994 01 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,142 $5,400 Not Implemented
ME0129 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $770 $900 Not Implemented
ME0129 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,700 $19,600 Implemented
ME0129 # 04 Y:1994 04 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,522 $3,800 Not Implemented
ME0129 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $1,617 $880 Implemented
ME0128 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,591 $2,250 Implemented
ME0128 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $887 $100 Not Implemented
ME0128 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $938 $20 Implemented
ME0128 # 04 Y:1994 04 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,845 $1,120 Implemented
ME0128 # 05 Y:1994 05 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,886 $3,000 Not Implemented
ME0128 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $483 $450 Implemented
ME0125 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $50 Implemented
ME0125 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,070 $450 Implemented
ME0125 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $763 $0 Implemented
ME0125 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $951 $400 Not Implemented
ME0125 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $634 $500 Implemented
ME0125 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $990 $960 Implemented
ME0126 # 01 Y:1994 01 1994 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $25,970 $68,000 Not Implemented
ME0126 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $364 $811 Not Implemented
ME0126 # 03 Y:1994 03 1994 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $11,087 $6,000 Not Implemented
ME0126 # 04 Y:1994 04 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $288 $75 Not Implemented