IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0141 # 03 Y:1994 03 1994 IMPROVE COMBUSTION CONTROL CAPABILITY $1,896 $660 Not Implemented
ME0141 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,292 $0 Implemented
ME0141 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $619 $400 Implemented
ME0141 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $987 $250 Not Implemented
ME0141 # 07 Y:1994 07 1994 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,764 $2,150 Not Implemented
ME0141 # 08 Y:1994 08 1994 REPAIR AND ELIMINATE STEAM LEAKS $164 $70 Implemented
ME0139 # 01 Y:1994 01 1994 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $56,050 $77,000 Implemented
ME0139 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,810 $4,800 Not Implemented
ME0139 # 03 Y:1994 03 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $745 $1,000 Not Implemented
ME0139 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $430 $250 Not Implemented
ME0139 # 05 Y:1994 05 1994 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $880 $1,040 Not Implemented
ME0139 # 06 Y:1994 06 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,132 $1,760 Not Implemented
ME0139 # 07 Y:1994 07 1994 PAY UTILITY BILLS ON TIME $1,417 $0 Implemented
ME0138 # 01 Y:1994 01 1994 RECOVER AND REUSE COOLING WATER $6,000 $3,400 Not Implemented
ME0138 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,891 $20 Not Implemented
ME0138 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $2,933 $4,200 Not Implemented
ME0138 # 04 Y:1994 04 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,480 $1,140 Not Implemented
ME0138 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $520 $1,000 Not Implemented
ME0138 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $923 $500 Not Implemented
ME0138 # 07 Y:1994 07 1994 INSULATE FEEDWATER TANK $171 $68 Not Implemented
ME0135 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $390 $450 Implemented
ME0135 # 02 Y:1994 02 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $817 $350 Implemented
ME0135 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,700 $4,000 Not Implemented
ME0135 # 04 Y:1994 04 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $760 $600 Not Implemented
ME0135 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $5,300 Not Implemented