IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,867

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0152 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $894 $510 Implemented
MI0151 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $67,528 $120 Implemented
MI0151 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,594 $20,498 Implemented
MI0151 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,109 $1,074 Implemented
MI0150 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,220 $30 Implemented
MI0150 # 09 Y:2007 09 2007 $1,658 $300 Implemented
MI0149 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,814 $120 Implemented
MI0149 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,030 $1,074 Implemented
MI0147 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,581 $16,000 Implemented
MI0147 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,498 $1,750 Implemented
MI0147 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,305 $7,878 Implemented
MI0146 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $37,375 $30 Implemented
MI0146 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,482 $1,074 Implemented
MI0146 # 04 Y:2007 04 2007 HEAT WATER WITH EXHAUST HEAT $14,461 $1,349 Implemented
MI0145 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $26,104 $915 Implemented
MI0145 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,164 $45,864 Implemented
MI0145 # 05 Y:2007 05 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,120 $1,175 Implemented
MI0145 # 07 Y:2007 07 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $142 $225 Implemented
MI0142 # 02 Y:2007 02 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $70,674 $34 Implemented
MI0142 # 05 Y:2007 05 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $22,540 $850 Implemented
MI0140 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,875 $30 Implemented
MI0140 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,834 $1,074 Implemented
MI0140 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,195 $940 Implemented
MI0139 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,785 $1,074 Implemented
MI0139 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,909 $30 Implemented