Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,911
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0164 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,992 | $1,032 | Implemented |
MI0163 # 01 Y:2008 | 01 | 2008 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $600,000 | $200,000 | Implemented |
MI0163 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $4,023 | $1,957 | Implemented |
MI0163 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,724 | $11,286 | Implemented |
MI0163 # 05 Y:2008 | 05 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,968 | $2,151 | Implemented |
MI0162 # 02 Y:2008 | 02 | 2008 | CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE | $98,398 | $18,460 | Implemented |
MI0162 # 04 Y:2008 | 04 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $73,832 | $1,750 | Implemented |
MI0162 # 06 Y:2008 | 06 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $11,109 | $400 | Implemented |
MI0162 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,769 | $1,210 | Implemented |
MI0162 # 09 Y:2008 | 09 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,630 | $40 | Implemented |
MI0161 # 01 Y:2008 | 01 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $32,580 | $89,078 | Implemented |
MI0161 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,779 | $720 | Implemented |
MI0161 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,042 | $1,032 | Implemented |
MI0161 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $295 | $24 | Implemented |
MI0160 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,466 | $1,032 | Implemented |
MI0160 # 03 Y:2008 | 03 | 2008 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $16,476 | $474 | Implemented |
MI0160 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,705 | $17,226 | Implemented |
MI0160 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,319 | $24 | Implemented |
MI0159 # 01 Y:2008 | 01 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,617 | $120 | Implemented |
MI0159 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,137 | $1,210 | Implemented |
MI0159 # 03 Y:2008 | 03 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,615 | $3,475 | Implemented |
MI0159 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,266 | $3,978 | Implemented |
MI0159 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,337 | $40 | Implemented |
MI0159 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,238 | $280 | Implemented |
MI0159 # 08 Y:2008 | 08 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,521 | $480 | Implemented |