Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,050
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0008 # 03 Y:2001 | 03 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,272 | $5 | n/a |
MI0008 # 04 Y:2001 | 04 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $22,533 | $40 | n/a |
MI0008 # 05 Y:2001 | 05 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $28,850 | $400 | n/a |
MI0008 # 06 Y:2001 | 06 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $78,789 | $44,200 | n/a |
MI0008 # 07 Y:2001 | 07 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $105,300 | $1,212 | n/a |
MI0002 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,063 | $414 | Not Implemented |
MI0002 # 02 Y:2001 | 02 | 2001 | UPGRADE OBSOLETE EQUIPMENT | $22,409 | $6,500 | Not Implemented |
MI0002 # 03 Y:2001 | 03 | 2001 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $30,943 | $20 | Not Implemented |
MI0002 # 04 Y:2001 | 04 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $47,000 | $300 | Not Implemented |
MI0002 # 05 Y:2001 | 05 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,034 | $3,531 | Not Implemented |
MI0002 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,800 | $35 | Not Implemented |
MI0002 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,119 | $690 | Not Implemented |
MI0002 # 08 Y:2001 | 08 | 2001 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,409 | $20 | Not Implemented |
MI0002 # 09 Y:2001 | 09 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $94,000 | $33,124 | Not Implemented |
MI0003 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,015 | $10,000 | Not Implemented |
MI0003 # 02 Y:2001 | 02 | 2001 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $40,000 | $15,120 | Not Implemented |
MI0003 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,044 | $312 | Implemented |
MI0003 # 04 Y:2001 | 04 | 2001 | METER WASTE WATER | $25,076 | $3,650 | Not Implemented |
MI0003 # 05 Y:2001 | 05 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $125,000 | $136,000 | Not Implemented |
MI0003 # 06 Y:2001 | 06 | 2001 | MOVE PRODUCT USING MECHANICAL MEANS | $40,000 | $2,900 | Implemented |
MI0001 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,545 | $200 | Not Implemented |
MI0001 # 02 Y:2001 | 02 | 2001 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $24,240 | $20,000 | n/a |
MI0001 # 03 Y:2001 | 03 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $96,000 | $25,000 | Implemented |
MI0001 # 04 Y:2001 | 04 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,041 | $1,360 | Not Implemented |
MI0001 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $480 | $60 | Implemented |