IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,594

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0002 # 02 Y:2001 02 2001 UPGRADE OBSOLETE EQUIPMENT $22,409 $6,500 Not Implemented
MI0002 # 03 Y:2001 03 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $30,943 $20 Not Implemented
MI0002 # 04 Y:2001 04 2001 $47,000 $300 Not Implemented
MI0002 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,034 $3,531 Not Implemented
MI0002 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $35 Not Implemented
MI0002 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,119 $690 Not Implemented
MI0002 # 08 Y:2001 08 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,409 $20 Not Implemented
MI0002 # 09 Y:2001 09 2001 $94,000 $33,124 Not Implemented
MI0003 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,015 $10,000 Not Implemented
MI0003 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $40,000 $15,120 Not Implemented
MI0003 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,044 $312 Implemented
MI0003 # 04 Y:2001 04 2001 METER WASTE WATER $25,076 $3,650 Not Implemented
MI0003 # 05 Y:2001 05 2001 $125,000 $136,000 Not Implemented
MI0003 # 06 Y:2001 06 2001 $40,000 $2,900 Implemented
MI0001 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,545 $200 Not Implemented
MI0001 # 02 Y:2001 02 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $24,240 $20,000 n/a
MI0001 # 03 Y:2001 03 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $96,000 $25,000 Implemented
MI0001 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,041 $1,360 Not Implemented
MI0001 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $60 Implemented