Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,594
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0435 # 10 Y:2023 | 10 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,011 | $0 | n/a |
MI0435 # 07 Y:2023 | 07 | 2023 | REDUCE VENTILATION AIR | $4,793 | $5,900 | n/a |
MI0435 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $28,034 | $780 | n/a |
MI0435 # 03 Y:2023 | 03 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,206 | $26,962 | n/a |
MI0435 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,992 | $13,440 | n/a |
MI0435 # 08 Y:2023 | 08 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $4,360 | $3,208 | n/a |
MI0435 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,484 | $21,636 | n/a |
MI0435 # 12 Y:2023 | 12 | 2023 | INSTALL OCCUPANCY SENSORS | $297 | $96 | n/a |
MI0435 # 11 Y:2023 | 11 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $762 | $770 | n/a |
MI0434 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,048 | $0 | n/a |
MI0434 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,225 | $2,000 | n/a |
MI0434 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $2,333 | $750 | n/a |
MI0434 # 06 Y:2023 | 06 | 2023 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $3,200 | $3,460 | n/a |
MI0434 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,559 | $12,210 | n/a |
MI0434 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,530 | $960 | n/a |
MI0434 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $29,836 | $550 | n/a |
MI0434 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,323 | $7,394 | n/a |
MI0433 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,622 | $1,720 | n/a |
MI0433 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,476 | $80 | n/a |
MI0433 # 05 Y:2023 | 05 | 2023 | PAY UTILITY BILLS ON TIME | $202 | $0 | n/a |
MI0433 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,297 | $1,752 | n/a |
MI0433 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,706 | $3,257 | n/a |
MI0432 # 08 Y:2023 | 08 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $678 | $490 | n/a |
MI0432 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $276 | $1,150 | n/a |
MI0432 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,952 | $120 | n/a |