Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,683
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0317 # 03 Y:2017 | 03 | 2017 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $29,203 | $11,300 | Not Implemented |
MI0317 # 04 Y:2017 | 04 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $18,556 | $8,294 | Implemented |
MI0317 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,568 | $120 | Implemented |
MI0317 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,683 | $1,885 | Implemented |
MI0317 # 07 Y:2017 | 07 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,154 | $2,140 | Not Implemented |
MI0317 # 08 Y:2017 | 08 | 2017 | INSULATE BARE EQUIPMENT | $431 | $151 | Not Implemented |
MI0316 # 01 Y:2017 | 01 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $313,428 | $142,400 | Not Implemented |
MI0316 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $72,034 | $39,216 | Implemented |
MI0316 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,854 | $61,030 | Implemented |
MI0316 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,732 | $1,660 | Implemented |
MI0316 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,995 | $120 | Implemented |
MI0316 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $10,816 | $7,881 | Implemented |
MI0316 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,887 | $4,577 | Not Implemented |
MI0316 # 08 Y:2017 | 08 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,115 | $18,100 | Not Implemented |
MI0316 # 09 Y:2017 | 09 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,991 | $2,140 | Implemented |
MI0316 # 10 Y:2017 | 10 | 2017 | USE PHOTOCELL CONTROLS | $4,891 | $4,136 | Not Implemented |
MI0316 # 11 Y:2017 | 11 | 2017 | INSTALL OCCUPANCY SENSORS | $4,454 | $1,280 | Implemented |
MI0316 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,829 | $4,674 | Implemented |
MI0316 # 13 Y:2017 | 13 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,011 | $654 | Implemented |
MI0315 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $60,269 | $1,660 | Implemented |
MI0315 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $28,850 | $36,000 | Implemented |
MI0315 # 03 Y:2017 | 03 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $23,532 | $1,560 | Not Implemented |
MI0315 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,687 | $960 | Implemented |
MI0315 # 05 Y:2017 | 05 | 2017 | USE OPTIMUM THICKNESS INSULATION | $10,994 | $1,320 | Not Implemented |
MI0315 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $9,833 | $434 | Implemented |