IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,050

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0280 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,428 $1,660 Implemented
MI0280 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,213 $40 Not Implemented
MI0280 # 05 Y:2015 05 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,213 $4,750 Implemented
MI0280 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $1,053 $332 Implemented
MI0280 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $3,520 Implemented
MI0280 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $393 $220 Implemented
MI0280 # 09 Y:2015 09 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $233 $375 Implemented
MI0279 # 01 Y:2015 01 2015 INCREASE EFFICIENCY OF TRUCKS $30,426 $29,000 Not Implemented
MI0279 # 02 Y:2015 02 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $29,100 $80,000 Not Implemented
MI0279 # 03 Y:2015 03 2015 RECOVER AND REUSE COOLING WATER $12,134 $497 Implemented
MI0279 # 04 Y:2015 04 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,413 $12,060 Implemented
MI0279 # 05 Y:2015 05 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,141 $2,100 Implemented
MI0279 # 06 Y:2015 06 2015 USE OPTIMUM THICKNESS INSULATION $4,666 $1,810 Implemented
MI0279 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,329 $40 Implemented
MI0279 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,877 $2,520 Implemented
MI0279 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $1,612 $482 Implemented
MI0279 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,456 $1,782 Not Implemented
MI0279 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,317 $3,280 Not Implemented
MI0279 # 12 Y:2015 12 2015 USE PHOTOCELL CONTROLS $1,139 $480 Implemented
MI0279 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $634 $1,760 Implemented
MI0278 # 01 Y:2015 01 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $103,740 $220,000 Not Implemented
MI0278 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $94,012 $102,610 Not Implemented
MI0278 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $45,923 $79,106 Implemented
MI0278 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,431 $9,248 Implemented
MI0278 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,235 $1,660 Implemented