IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,050

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0263 # 06 Y:2014 06 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,052 $560 Implemented
MI0263 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,377 $10,770 Not Implemented
MI0263 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $1,643 $497 Implemented
MI0263 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,472 $1,660 Implemented
MI0263 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $1,375 $360 Implemented
MI0263 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $80 Implemented
MI0263 # 12 Y:2014 12 2014 INSULATE BARE EQUIPMENT $708 $280 Not Implemented
MI0263 # 13 Y:2014 13 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $409 $173 Implemented
MI0262 # 01 Y:2014 01 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,730 $2,100 Not Implemented
MI0262 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $12,213 $400 Implemented
MI0262 # 03 Y:2014 03 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,987 $16,340 Not Implemented
MI0262 # 04 Y:2014 04 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,323 $3,240 Implemented
MI0262 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,253 $1,660 Implemented
MI0262 # 06 Y:2014 06 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,456 $9,180 Not Implemented
MI0262 # 07 Y:2014 07 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,255 $3,600 Not Implemented
MI0262 # 08 Y:2014 08 2014 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $4,075 $8,800 Not Implemented
MI0262 # 09 Y:2014 09 2014 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,426 $1,430 Implemented
MI0262 # 10 Y:2014 10 2014 PAY BILLS ON TIME TO AVOID LATE FEES $2,229 $240 Implemented
MI0262 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,311 $80 Implemented
MI0261 # 01 Y:2014 01 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $48,959 $119,260 Not Implemented
MI0261 # 02 Y:2014 02 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,152 $5,847 Implemented
MI0261 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $11,002 $11,420 Not Implemented
MI0261 # 04 Y:2014 04 2014 PAY BILLS ON TIME TO AVOID LATE FEES $4,107 $240 Implemented
MI0261 # 05 Y:2014 05 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,538 $3,615 Implemented
MI0261 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $3,521 $580 Implemented