Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0141 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,825 | $2,460 | Not Implemented |
MI0141 # 04 Y:2006 | 04 | 2006 | AIR CONDITION ONLY SPACE NECESSARY | $2,681 | $160 | Not Implemented |
MI0141 # 03 Y:2006 | 03 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,036 | $0 | Not Implemented |
MI0141 # 02 Y:2006 | 02 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,232 | $200 | Not Implemented |
MI0141 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $20,786 | $36,000 | Not Implemented |
MI0140 # 05 Y:2006 | 05 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,523 | $6,267 | Not Implemented |
MI0140 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,195 | $940 | Implemented |
MI0140 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,779 | $41,070 | Not Implemented |
MI0140 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,834 | $1,074 | Implemented |
MI0140 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,875 | $30 | Implemented |
MI0139 # 05 Y:2006 | 05 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,192 | $5,000 | Implemented |
MI0139 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,787 | $40,200 | Not Implemented |
MI0139 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,014 | $50,232 | Not Implemented |
MI0139 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,909 | $30 | Implemented |
MI0139 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,785 | $1,074 | Implemented |
MI0138 # 08 Y:2006 | 08 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,463 | $142 | Not Implemented |
MI0138 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,928 | $1,074 | Implemented |
MI0138 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,014 | $20,014 | Not Implemented |
MI0138 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,551 | $54,600 | Not Implemented |
MI0138 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,522 | $30 | Not Implemented |
MI0138 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,001 | $9,540 | Not Implemented |
MI0138 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $18,750 | $4,708 | Not Implemented |
MI0138 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,808 | $713 | Not Implemented |
MI0137 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,436 | $1,074 | Implemented |
MI0137 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,128 | $175 | Implemented |