Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
111
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0174 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,087 | $13,200 | Not Implemented |
MI0174 # 06 Y:2008 | 06 | 2008 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,075 | $322 | Implemented |
MI0174 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,041 | $1,210 | Implemented |
MI0174 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,544 | $40 | Implemented |
MI0174 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $32,694 | $2,000 | Implemented |
MI0174 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $214,998 | $360,000 | Not Implemented |
MI0173 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,963 | $1,210 | Implemented |
MI0173 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,034 | $7,000 | Implemented |
MI0173 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,483 | $21,312 | Not Implemented |
MI0173 # 07 Y:2008 | 07 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,484 | $4,400 | Implemented |
MI0173 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,609 | $1,563 | Implemented |
MI0173 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,156 | $30,132 | Not Implemented |
MI0173 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,203 | $950 | Implemented |
MI0172 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,251 | $24 | Implemented |
MI0172 # 01 Y:2008 | 01 | 2008 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $126,000 | $66,640 | Not Implemented |
MI0172 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,883 | $1,210 | Implemented |
MI0172 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,860 | $8,778 | Implemented |
MI0172 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $86,926 | $83,640 | Implemented |
MI0172 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,695 | $1,210 | Implemented |
MI0172 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $343 | $24 | Implemented |
MI0172 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $728 | $1,200 | Implemented |
MI0171 # 02 Y:2008 | 02 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $131,514 | $7,800 | Not Implemented |
MI0171 # 01 Y:2008 | 01 | 2008 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $170,598 | $351,000 | Not Implemented |
MI0171 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $101,069 | $53,922 | Not Implemented |
MI0171 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,317 | $1,210 | Not Implemented |