Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
167
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0239 # 05 Y:2003 | 05 | 2003 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $2,265 | $6,000 | Implemented |
MS0239 # 07 Y:2003 | 07 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,839 | $1,000 | Implemented |
MS0239 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,196 | $17,859 | Implemented |
MS0239 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,584 | $15,350 | Implemented |
MS0239 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $317 | $427 | Not Implemented |
MS0239 # 02 Y:2003 | 02 | 2003 | BURN WASTE OIL FOR HEAT | $26,706 | $36,010 | n/a |
MS0239 # 11 Y:2003 | 11 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $222 | $119 | Not Implemented |
MS0239 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,703 | $2,350 | Not Implemented |
MS0239 # 01 Y:2003 | 01 | 2003 | UPGRADE OBSOLETE EQUIPMENT | $159,344 | $600,000 | Not Implemented |
MS0239 # 06 Y:2003 | 06 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,948 | $252 | Not Implemented |
MS0239 # 09 Y:2003 | 09 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $323 | $742 | Not Implemented |
MS0241 # 08 Y:2003 | 08 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,103 | $1,102 | Not Implemented |
MS0241 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,721 | $7,328 | Not Implemented |
MS0241 # 09 Y:2003 | 09 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,854 | $3,600 | Implemented |
MS0241 # 11 Y:2003 | 11 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $856 | $1,575 | Not Implemented |
MS0241 # 04 Y:2003 | 04 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $11,644 | $760 | Implemented |
MS0241 # 07 Y:2003 | 07 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,613 | $0 | Implemented |
MS0241 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $30,220 | $20,410 | Implemented |
MS0241 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $52,802 | $8,788 | n/a |
MS0241 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,062 | $2,486 | Not Implemented |
MS0241 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,378 | $129 | Implemented |
MS0241 # 10 Y:2003 | 10 | 2003 | INSTALL OCCUPANCY SENSORS | $1,004 | $416 | Not Implemented |
MS0240 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,210 | $228 | Implemented |
MS0240 # 06 Y:2003 | 06 | 2003 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,995 | $528 | Implemented |
MS0240 # 03 Y:2003 | 03 | 2003 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $18,919 | $2,010 | Not Implemented |