Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,985
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0075 # 04 Y:1995 | 04 | 1995 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $5,067 | $8,000 | Implemented |
NC0075 # 05 Y:1995 | 05 | 1995 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $72,500 | $170,000 | Implemented |
NC0075 # 06 Y:1995 | 06 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $720 | $200 | Implemented |
NC0073 # 01 Y:1995 | 01 | 1995 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $87,425 | $160,000 | Not Implemented |
NC0073 # 02 Y:1995 | 02 | 1995 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $16,833 | $84,000 | Not Implemented |
NC0073 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $416 | $120 | Implemented |
NC0073 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,535 | $1,320 | Not Implemented |
NC0073 # 05 Y:1995 | 05 | 1995 | USE POWER DURING OFF-PEAK PERIODS | $4,284 | $0 | Implemented |
NC0072 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $702 | $780 | n/a |
NC0072 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,164 | $96 | n/a |
NC0072 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,034 | $1,678 | n/a |
NC0072 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $343 | $270 | n/a |
NC0072 # 05 Y:1995 | 05 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,426 | $600 | n/a |
NC0072 # 06 Y:1995 | 06 | 1995 | REDUCE VENTILATION AIR | $2,692 | $2,700 | n/a |
NC0072 # 07 Y:1995 | 07 | 1995 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $93,047 | $400,000 | n/a |
NC0072 # 08 Y:1995 | 08 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $851 | $434 | n/a |
NC0072 # 09 Y:1995 | 09 | 1995 | RETURN SPENT SOLUTIONS TO THE MANUFACTURER | $45,541 | $10,000 | n/a |
NC0072 # 10 Y:1995 | 10 | 1995 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,784 | $0 | n/a |
NC0070 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,358 | $360 | Implemented |
NC0070 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,703 | $1,348 | Not Implemented |
NC0070 # 03 Y:1995 | 03 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $634 | $1,600 | Not Implemented |
NC0070 # 04 Y:1995 | 04 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,380 | $9,000 | Not Implemented |
NC0070 # 05 Y:1995 | 05 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,371 | $3,525 | Not Implemented |
NC0070 # 06 Y:1995 | 06 | 1995 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $4,000 | $10,000 | Not Implemented |
NC0069 # 01 Y:1995 | 01 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,000 | $45,000 | Implemented |