Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,985
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0058 # 05 Y:1995 | 05 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,618 | $2,500 | Implemented |
NC0058 # 06 Y:1995 | 06 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $20,246 | $4,000 | Not Implemented |
NC0058 # 07 Y:1995 | 07 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,975 | $240 | Implemented |
NC0058 # 08 Y:1995 | 08 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,702 | $0 | Implemented |
NC0058 # 09 Y:1995 | 09 | 1995 | INSULATE BARE EQUIPMENT | $4,862 | $1,500 | Not Implemented |
NC0057 # 01 Y:1995 | 01 | 1995 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $7,069 | $0 | Implemented |
NC0057 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $142 | $180 | Implemented |
NC0057 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $415 | $250 | Not Implemented |
NC0057 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $680 | $984 | Not Implemented |
NC0057 # 05 Y:1995 | 05 | 1995 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,881 | $10,000 | Not Implemented |
NC0055 # 01 Y:1995 | 01 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,521 | $1,200 | Implemented |
NC0055 # 02 Y:1995 | 02 | 1995 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $144,508 | $638,000 | Not Implemented |
NC0055 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,431 | $480 | Implemented |
NC0055 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $658 | $3,360 | Implemented |
NC0055 # 05 Y:1995 | 05 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,143 | $28,000 | Not Implemented |
NC0055 # 06 Y:1995 | 06 | 1995 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $56,724 | $55,000 | Not Implemented |
NC0055 # 07 Y:1995 | 07 | 1995 | MINIMIZE WATER USAGE | $8,114 | $10,000 | Not Implemented |
NC0055 # 08 Y:1995 | 08 | 1995 | MINIMIZE WATER USAGE | $331,638 | $1,750,000 | Not Implemented |
NC0054 # 01 Y:1995 | 01 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,963 | $1,500 | Not Implemented |
NC0054 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,092 | $360 | Implemented |
NC0054 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,362 | $11,760 | Not Implemented |
NC0054 # 04 Y:1995 | 04 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,675 | $475 | Not Implemented |
NC0054 # 05 Y:1995 | 05 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,438 | $5,749 | Implemented |
NC0056 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $168 | $152 | Implemented |
NC0056 # 02 Y:1995 | 02 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,092 | $250 | Implemented |