IAC logo
IAC Assessment: NC0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1995
Principal Product Blow Molded Plastics
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $5,000,000-$10,000,000
# of Employees 108
Plant Area (Sq.Ft.) 92,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $729,026 17,055,686 kWh $0.04
Natural Gas $26,073 4,904 MMBtu $5.32
TOTAL ENERGY COSTS $755,099
RECOMMENDED SAVINGS* $92,552 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,346
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$149
Cost:
$292
$149 3,224 - - $149
3,224
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,902
Cost:
$30,410
$16,902 379,836 - - $16,902
379,836
kWh
-
-
MMBtu
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,940
Cost:
$10,000
$3,940 123,681 - - $3,940
123,681
kWh
-
-
MMBtu
04: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$19,158
Cost:
$80,000
$19,158 - - - $19,158
-
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,618
Cost:
$2,500
$1,618 36,342 - - $1,618
36,342
kWh
-
-
MMBtu
06: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$20,246
Cost:
$4,000
$246 5,275 $20,000 3,781 $246
5,275
kWh
$20,000
3,781
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,975
Cost:
$240
$11,975 269,050 - - $11,975
269,050
kWh
-
-
MMBtu
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,702
Cost:
-
$13,702 - - - $13,702
-
kWh
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,862
Cost:
$1,500
$4,862 109,320 - - $4,862
109,320
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$92,552
Cost:
$128,942
$72,552 926,728 $20,000 3,781 $72,552
926,728
kWh
$20,000
3,781
MMBtu
TOTAL IMPLEMENTED Savings:
$44,346
Cost:
$33,442
$44,346 688,452 - - $44,346
688,452
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas