IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0117 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $187 $149 Implemented
NC0117 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $982 Implemented
NC0117 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,289 $600 Implemented
NC0117 # 08 Y:1997 08 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $8,850 $1,000 Implemented
NC0117 # 09 Y:1997 09 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $5,000 $3,600 Not Implemented
NC0115 # 01 Y:1997 01 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,668 $17,363 Implemented
NC0115 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,149 $320 Implemented
NC0115 # 03 Y:1997 03 1997 REDUCE VENTILATION AIR $6,190 $2,765 Not Implemented
NC0115 # 04 Y:1997 04 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,108 $4,000 Not Implemented
NC0115 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $726 $120 Implemented
NC0115 # 06 Y:1997 06 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $848 $299 Implemented
NC0115 # 07 Y:1997 07 1997 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $391 $0 Not Implemented
NC0115 # 08 Y:1997 08 1997 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $2,191 $2,000 Not Implemented
NC0115 # 09 Y:1997 09 1997 IMPROVE SPACE COMFORT CONDITIONING $5,760 $9,150 Not Implemented
NC0119 # 01 Y:1997 01 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,540 $9,360 Not Implemented
NC0119 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $832 $180 Implemented
NC0119 # 03 Y:1997 03 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,719 $5,750 Implemented
NC0119 # 04 Y:1997 04 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,369 $0 Not Implemented
NC0119 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,047 $43,046 Not Implemented
NC0119 # 06 Y:1997 06 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,220 $45,000 Not Implemented
NC0119 # 07 Y:1997 07 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,808 $39,078 Not Implemented
NC0119 # 08 Y:1997 08 1997 REDUCE SCRAP PRODUCTION $13,896 $15,000 Implemented
NC0119 # 09 Y:1997 09 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,671 $26,025 Not Implemented
NC0119 # 10 Y:1997 10 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $2,906 $6,000 Not Implemented
NC0119 # 11 Y:1997 11 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,369 $5,200 Not Implemented