IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0056 # 05 Y:1995 05 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,813 $320 Implemented
NC0056 # 06 Y:1995 06 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,221 $0 Implemented
NC0056 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,168 $4,000 Not Implemented
NC0056 # 08 Y:1995 08 1995 CONTRACT A WOOD PALLET RECYCLING COMPANY $200 $100 Implemented
NC0056 # 09 Y:1995 09 1995 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $186 $100 Implemented
NC0051 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,276 $570 Not Implemented
NC0051 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,978 $420 Implemented
NC0051 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,450 $12,000 Not Implemented
NC0051 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,438 $4,430 Implemented
NC0051 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $1,960 Not Implemented
NC0051 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,236 $3,200 Not Implemented
NC0051 # 07 Y:1995 07 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,190 $0 Implemented
NC0051 # 08 Y:1995 08 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $24,714 $18,000 Not Implemented
NC0051 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,325 $3,800 Not Implemented
NC0050 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,208 $4,662 Implemented
NC0050 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $4,041 $9,817 Implemented
NC0050 # 03 Y:1995 03 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,910 $15,000 Not Implemented
NC0050 # 04 Y:1995 04 1995 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $14,172 $35,000 Not Implemented
NC0050 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $291 $1,320 Implemented
NC0050 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,114 $300 Implemented
NC0050 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $440 Not Implemented
NC0050 # 08 Y:1995 08 1995 USE A DIFFERENT OR RECYCLED RAW MATERIAL $678 $0 Not Implemented
NC0050 # 09 Y:1995 09 1995 USE LESS WASTEFUL PACKAGING $3,717 $0 Implemented
NC0049 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,182 $1,290 Implemented
NC0049 # 02 Y:1995 02 1995 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $13,275 $180,000 Not Implemented