IAC logo
IAC Assessment: NC0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1995
Principal Product Dyed and Finished Knitted Cloth
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 249,000
Annual Production 12,500,000 Pounds
Production Hrs. Annual 7,200
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $994,856 17,272,568 kWh $0.06
Natural Gas $375,347 123,503 MMBtu $3.04
Wood $241,352 189,108 MMBtu $1.28
TOTAL ENERGY COSTS $1,635,545
RECOMMENDED SAVINGS* $68,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,606
#|Description Savings
Cost
Status Electricity Usage Natural Gas Wood Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Natural Gas Wood Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ MMBtu $ MMBtu $ lb $ lb
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,276
Cost:
$570
$2,276 39,859 - - - - - - - - $2,276
39,859
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,978
Cost:
$420
$1,978 34,584 - - - - - - - - $1,978
34,584
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,450
Cost:
$12,000
$6,450 113,130 - - - - - - - - $6,450
113,130
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,438
Cost:
$4,430
$6,438 112,837 - - - - - - - - $6,438
112,837
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,206
Cost:
$1,960
$3,206 48,652 - - - - - - - - $3,206
48,652
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,236
Cost:
$3,200
$14,236 268,464 - - - - - - - - $14,236
268,464
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$3,190
Cost:
-
- - - - - - $3,190 180,000 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$3,190
180,000
lb
-
-
lb
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$24,714
Cost:
$18,000
- - - - $3,914 3,067 - - $20,800 1,560,000 -
-
kWh
-
-
MMBtu
$3,914
3,067
MMBtu
-
-
lb
$20,800
1,560,000
lb
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,325
Cost:
$3,800
- - $6,325 2,330 - - - - - - -
-
kWh
$6,325
2,330
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
TOTAL RECOMMENDED Savings:
$68,813
Cost:
$44,380
$34,584 617,526 $6,325 2,330 $3,914 3,067 $3,190 180,000 $20,800 1,560,000 $34,584
617,526
kWh
$6,325
2,330
MMBtu
$3,914
3,067
MMBtu
$3,190
180,000
lb
$20,800
1,560,000
lb
TOTAL IMPLEMENTED Savings:
$11,606
Cost:
$4,850
$8,416 147,421 - - - - $3,190 180,000 - - $8,416
147,421
kWh
-
-
MMBtu
-
-
MMBtu
$3,190
180,000
lb
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ lb $ lb
Electricity Usage Natural Gas Wood Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Natural Gas Wood Solid Waste (non-haz) Solid Waste (haz)