Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1995 |
Principal Product | Dyed and Finished Knitted Cloth |
NAICS | n/a |
SIC | 2269 - Finishing Plants, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 249,000 |
Annual Production | 12,500,000 Pounds |
Production Hrs. Annual | 7,200 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $994,856 | 17,272,568 | kWh | $0.06 |
Natural Gas | $375,347 | 123,503 | MMBtu | $3.04 |
Wood | $241,352 | 189,108 | MMBtu | $1.28 |
TOTAL ENERGY COSTS | $1,635,545 | |||
RECOMMENDED SAVINGS* | $68,813 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,606 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Wood | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Wood | Solid Waste (non-haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,276 Cost: $570 |
$2,276 | 39,859 | - | - | - | - | - | - | - | - |
$2,276 39,859 kWh |
- - MMBtu |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,978 Cost: $420 |
$1,978 | 34,584 | - | - | - | - | - | - | - | - |
$1,978 34,584 kWh |
- - MMBtu |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $6,450 Cost: $12,000 |
$6,450 | 113,130 | - | - | - | - | - | - | - | - |
$6,450 113,130 kWh |
- - MMBtu |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,438 Cost: $4,430 |
$6,438 | 112,837 | - | - | - | - | - | - | - | - |
$6,438 112,837 kWh |
- - MMBtu |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,206 Cost: $1,960 |
$3,206 | 48,652 | - | - | - | - | - | - | - | - |
$3,206 48,652 kWh |
- - MMBtu |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,236 Cost: $3,200 |
$14,236 | 268,464 | - | - | - | - | - | - | - | - |
$14,236 268,464 kWh |
- - MMBtu |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $3,190 Cost: - |
- | - | - | - | - | - | $3,190 | 180,000 | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$3,190 180,000 lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $24,714 Cost: $18,000 |
- | - | - | - | $3,914 | 3,067 | - | - | $20,800 | 1,560,000 |
- - kWh |
- - MMBtu |
$3,914 3,067 MMBtu |
- - lb |
$20,800 1,560,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $6,325 Cost: $3,800 |
- | - | $6,325 | 2,330 | - | - | - | - | - | - |
- - kWh |
$6,325 2,330 MMBtu |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $68,813 Cost: $44,380 |
$34,584 | 617,526 | $6,325 | 2,330 | $3,914 | 3,067 | $3,190 | 180,000 | $20,800 | 1,560,000 | $34,584 617,526 kWh |
$6,325 2,330 MMBtu |
$3,914 3,067 MMBtu |
$3,190 180,000 lb |
$20,800 1,560,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,606 Cost: $4,850 |
$8,416 | 147,421 | - | - | - | - | $3,190 | 180,000 | - | - | $8,416 147,421 kWh |
- - MMBtu |
- - MMBtu |
$3,190 180,000 lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Wood | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Wood | Solid Waste (non-haz) | Solid Waste (haz) |