IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0032 # 05 Y:1994 05 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $269 $75 Not Implemented
NC0032 # 06 Y:1994 06 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,196 $4,900 Not Implemented
NC0031 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $390 Implemented
NC0031 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $419 $250 Implemented
NC0031 # 03 Y:1994 03 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,470 $520 Not Implemented
NC0031 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $651 $831 Implemented
NC0031 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $554 $486 Implemented
NC0031 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,050 $10,000 Not Implemented
NC0030 # 01 Y:1994 01 1994 USE OPTIMUM THICKNESS INSULATION $176,704 $52,500 n/a
NC0030 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,871 $27,600 n/a
NC0030 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $26,900 $60,000 n/a
NC0030 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,452 $23,090 n/a
NC0030 # 05 Y:1994 05 1994 REDESIGN PROCESS $2,768 $782 n/a
NC0029 # 01 Y:1994 01 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $11,457 $153,000 Not Implemented
NC0029 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,131 $480 Implemented
NC0029 # 03 Y:1994 03 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $14,345 $40,000 Implemented
NC0029 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,050 $520 Not Implemented
NC0029 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $562 $378 Not Implemented
NC0028 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $153 $250 Implemented
NC0028 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $600 Implemented
NC0028 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $787 $240 Not Implemented
NC0028 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $736 $1,510 Implemented
NC0028 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,525 $7,000 Not Implemented
NC0027 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,154 $412 Not Implemented
NC0027 # 02 Y:1994 02 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,555 $0 Not Implemented