IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0533 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $567 $100 Not Implemented
NC0533 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $751 $3,000 Not Implemented
NC0533 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $384 $100 Implemented
NC0533 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $254 $450 Implemented
NC0532 # 01 Y:2015 01 2015 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $48,749 $105,000 Not Implemented
NC0532 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,143 $73,960 Implemented
NC0532 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $773 $240 Implemented
NC0532 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $438 Implemented
NC0532 # 05 Y:2015 05 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,636 $45,000 Implemented
NC0532 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $17,917 $8,000 Not Implemented
NC0532 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,753 $1,620 Implemented
NC0532 # 08 Y:2015 08 2015 REPAIR AND ELIMINATE STEAM LEAKS $990 $450 Implemented
NC0532 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,703 $500 Not Implemented
NC0532 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,952 $100 Not Implemented
NC0532 # 11 Y:2015 11 2015 REDUCE FLUID FLOW RATES $8,338 $5,000 Not Implemented
NC0532 # 12 Y:2015 12 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,924 $1,935 Not Implemented
NC0530 # 01 Y:2014 01 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,069 $54,000 Not Implemented
NC0530 # 02 Y:2014 02 2014 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,055 $0 Implemented
NC0530 # 03 Y:2014 03 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,962 $200 Implemented
NC0530 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,946 $18,000 Not Implemented
NC0530 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,542 $5,000 Not Implemented
NC0530 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $443 $200 Implemented
NC0530 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,767 $4,000 Not Implemented
NC0530 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,623 $2,350 Implemented
NC0530 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $2,127 $6,420 Not Implemented