Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
74
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0802 # 09 Y:2010 | 09 | 2010 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,625 | $0 | Implemented |
OK0802 # 10 Y:2010 | 10 | 2010 | COMBINE UTILITY METERS | $936 | $175 | Implemented |
OK0802 # 06 Y:2010 | 06 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,918 | $2,775 | Implemented |
OK0802 # 07 Y:2010 | 07 | 2010 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $30,411 | $45,000 | Implemented |
OK0802 # 08 Y:2010 | 08 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $23,800 | $15,600 | Implemented |
OK0802 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $1,998 | $13,149 | Implemented |
OK0802 # 05 Y:2010 | 05 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $11,414 | $51,875 | Implemented |
OK0802 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,400 | $1,550 | Implemented |
OK0801 # 02 Y:2010 | 02 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,599 | $34,948 | Implemented |
OK0801 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $995 | $2,625 | Implemented |
OK0801 # 12 Y:2010 | 12 | 2010 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $4,196 | $21,075 | Implemented |
OK0801 # 03 Y:2010 | 03 | 2010 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $9,699 | $3,000 | Implemented |
OK0801 # 01 Y:2010 | 01 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $6,511 | $78,169 | Implemented |
OK0800 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $860 | $1,865 | Implemented |
OK0800 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $1,678 | Implemented |
OK0800 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,134 | $706 | Implemented |
OK0800 # 03 Y:2010 | 03 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $209 | $334 | Implemented |
OK0800 # 02 Y:2010 | 02 | 2010 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,667 | $2,700 | Implemented |
OK0798 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,826 | $900 | Implemented |
OK0798 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,085 | $5,205 | Implemented |
OK0798 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203 | $2,009 | Implemented |
OK0798 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,000 | $0 | Implemented |
OK0798 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $8,199 | $2,430 | Implemented |
OK0798 # 06 Y:2010 | 06 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,240 | $0 | Implemented |
OK0798 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,120 | $1,991 | Implemented |