IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1101 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,452 $2,800 Implemented
OK1098 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $2,834 Implemented
OK1098 # 02 Y:2023 02 2023 REPLACE BOILER $2,974 $78,000 Implemented
OK1098 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75 $100 Implemented
OK1099 # 04 Y:2023 04 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $160 $510 Implemented
OK1097 # 03 Y:2023 03 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $310 $291 Implemented
OK1096 # 08 Y:2023 08 2023 MAINTAIN MACHINES TO REDUCE LEAKS $2,796 $500 Implemented
OK1096 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,865 $10,337 Implemented
OK1096 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $394,679 $75,000 Implemented
OK1096 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,791 $464,597 Implemented
OK1096 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $593 $1,354 Implemented
OK1095 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,107 $15,033 Implemented
OK1095 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,550 $554 Implemented
OK1095 # 08 Y:2023 08 2023 COVER OPEN TANKS $39,010 $6,977 Implemented
OK1095 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,046 $25,523 Implemented
OK1095 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,079 $1,741 Implemented
OK1094 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $573 $870 Implemented
OK1094 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,890 $94,115 Implemented
OK1094 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,917 $22,000 Implemented
OK1093 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,723 $1,260 Implemented
OK1093 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $900 Implemented
OK1093 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,830 $374,400 Implemented
OK1093 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,345 $8,534 Implemented
OK1093 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,354 $1,420 Implemented
OK1093 # 11 Y:2023 11 2023 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $98,980 $367,077 Implemented