Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,027
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0128 # 02 Y:1991 | 02 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $554 | $42 | Implemented |
RU0128 # 03 Y:1991 | 03 | 1991 | IMPROVE LUBRICATION PRACTICES | $1,753 | $800 | Implemented |
RU0128 # 04 Y:1991 | 04 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,320 | $0 | Implemented |
RU0128 # 05 Y:1991 | 05 | 1991 | INSULATE BARE EQUIPMENT | $630 | $169 | Implemented |
RU0128 # 06 Y:1991 | 06 | 1991 | USE OPTIMUM TEMPERATURE | $4,975 | $6,700 | Implemented |
RU0129 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,904 | $4,864 | Not Implemented |
RU0129 # 02 Y:1991 | 02 | 1991 | INSTALL SET-BACK TIMERS | $2,919 | $0 | Not Implemented |
RU0129 # 03 Y:1991 | 03 | 1991 | IMPROVE LUBRICATION PRACTICES | $2,919 | $800 | Not Implemented |
RU0129 # 04 Y:1991 | 04 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,874 | $0 | Not Implemented |
RU0129 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $807 | $0 | Not Implemented |
RU0120 # 01 Y:1991 | 01 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $922 | $0 | Not Implemented |
RU0120 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $560 | $136 | Not Implemented |
RU0120 # 03 Y:1991 | 03 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,940 | $0 | Not Implemented |
RU0120 # 04 Y:1991 | 04 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,037 | $113,640 | Not Implemented |
RU0120 # 05 Y:1991 | 05 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $853 | $11,328 | Not Implemented |
RU0121 # 01 Y:1991 | 01 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,136 | $0 | Implemented |
RU0121 # 02 Y:1991 | 02 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,316 | $267 | Implemented |
RU0121 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,917 | $459 | Implemented |
RU0121 # 04 Y:1991 | 04 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $300 | $500 | Implemented |
RU0121 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,648 | $0 | Implemented |
RU0121 # 06 Y:1991 | 06 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $51,300 | $0 | Implemented |
RU0121 # 07 Y:1991 | 07 | 1991 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,329 | $900 | Implemented |
RU0122 # 01 Y:1991 | 01 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,462 | $0 | Not Implemented |
RU0122 # 02 Y:1991 | 02 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,447 | $272 | Not Implemented |
RU0122 # 03 Y:1991 | 03 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,176 | $30 | Not Implemented |