IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0033 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,749 $0 Implemented
RU0033 # 06 Y:1988 06 1988 REDESIGN PROCESS $7,218 $24,000 Implemented
RU0033 # 07 Y:1988 07 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,018 $2,500 Implemented
RU0033 # 09 Y:1988 09 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $244 Implemented
RU0034 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,904 $0 Implemented
RU0034 # 02 Y:1988 02 1988 COVER OPEN TANKS $1,151 $300 Not Implemented
RU0034 # 03 Y:1988 03 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,442 $2,000 Implemented
RU0033 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $4,132 $402 Implemented
RU0034 # 05 Y:1988 05 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,647 $1,260 Not Implemented
RU0034 # 06 Y:1988 06 1988 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $5,906 $11,900 Not Implemented
RU0009 # 02 Y:1987 02 1987 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $410 $125 Not Implemented
RU0009 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $1,609 $1,600 Implemented
RU0009 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,243 $0 Implemented
RU0009 # 05 Y:1987 05 1987 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $140 $300 Not Implemented
RU0009 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $279 Implemented
RU0010 # 01 Y:1987 01 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $556 $400 Not Implemented
RU0010 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $0 Implemented
RU0010 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $120 $0 Implemented
RU0010 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12 $0 Implemented
RU0010 # 05 Y:1987 05 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $696 $450 Implemented
RU0010 # 06 Y:1987 06 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,458 $2,250 Not Implemented
RU0010 # 07 Y:1987 07 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $654 $316 Not Implemented
RU0009 # 01 Y:1987 01 1987 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,150 $4,392 Not Implemented