IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,242

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0661 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $250 Implemented
SD0661 # 08 Y:2024 08 2024 ADOPT IN-HOUSE MATERIAL GENERATION $809,075 $47,546 Not Implemented
SD0661 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,243 $7,340 Implemented
SD0661 # 10 Y:2024 10 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,652 $2,148 Not Implemented
SD0661 # 11 Y:2024 11 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $1,863 Implemented
SD0661 # 12 Y:2024 12 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $12,725 $11,775 Not Implemented
SD0661 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,043 $19,842 Implemented
SD0660 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $249,555 $400,591 Not Implemented
SD0660 # 02 Y:2024 02 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,912 $0 Not Implemented
SD0660 # 03 Y:2024 03 2024 USE PHOTOCELL CONTROLS $7,731 $3,463 Not Implemented
SD0660 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $7,224 $4,470 Not Implemented
SD0660 # 05 Y:2024 05 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,431,356 $2,700 Not Implemented
SD0660 # 06 Y:2024 06 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $39,277 $137,300 Not Implemented
SD0660 # 07 Y:2024 07 2024 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,963 $0 Not Implemented
SD0659 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $150,247 $333,540 Not Implemented
SD0659 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $48,096 $0 Not Implemented
SD0659 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,343 $34,702 Implemented
SD0659 # 04 Y:2024 04 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $78,160 $16,180 Not Implemented
SD0659 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,955 $2,109 Not Implemented
SD0659 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,742 $3,181 Not Implemented
SD0659 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,038 $57,435 Not Implemented
SD0659 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,562 $0 Implemented
SD0659 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,401 $2,880 Implemented
SD0659 # 10 Y:2024 10 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,080 $3,360 Not Implemented
SD0659 # 11 Y:2024 11 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $53,887 $3,345 Not Implemented