Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0571 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,069 | $64,391 | Implemented |
SF0571 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,241 | $10,932 | Implemented |
SF0570 # 01 Y:2021 | 01 | 2021 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $24,674 | $0 | Implemented |
SF0570 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,893 | $0 | Implemented |
SF0570 # 03 Y:2021 | 03 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $149,399 | $10,195 | Implemented |
SF0570 # 04 Y:2021 | 04 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $71,549 | $5,641 | Implemented |
SF0570 # 05 Y:2021 | 05 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $106,544 | $31,500 | Not Implemented |
SF0570 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $514 | $190 | Not Implemented |
SF0570 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $39,174 | $48,150 | Not Implemented |
SF0570 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,387 | $6,315 | Implemented |
SF0570 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $291 | $648 | Implemented |
SF0570 # 10 Y:2021 | 10 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,784 | $27,535 | Not Implemented |
SF0570 # 11 Y:2021 | 11 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $179,262 | $1,269,472 | Implemented |
SF0569 # 01 Y:2021 | 01 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,931 | $0 | Implemented |
SF0569 # 02 Y:2021 | 02 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $4,698 | $3,740 | Implemented |
SF0569 # 03 Y:2021 | 03 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $5,693 | $9,138 | Implemented |
SF0569 # 04 Y:2021 | 04 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,674 | $23,650 | Implemented |
SF0569 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $2,279 | $6,956 | Implemented |
SF0569 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $107,546 | $722,227 | Implemented |
SF0569 # 07 Y:2021 | 07 | 2021 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $143,550 | $77,720 | Implemented |
SF0568 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $40,609 | $0 | Not Implemented |
SF0568 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,914 | $0 | Implemented |
SF0568 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,183 | $400 | Not Implemented |
SF0568 # 04 Y:2021 | 04 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,048 | $860 | Implemented |
SF0568 # 05 Y:2021 | 05 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $26,520 | $43,936 | Not Implemented |