IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,167

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0420 # 12 Y:2012 12 2012 MINIMIZE WATER USAGE $5,598 $0 Not Implemented
SF0420 # 13 Y:2012 13 2012 MINIMIZE WATER USAGE $677 $0 Not Implemented
SF0419 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $80 Implemented
SF0419 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,754 $2,287 Not Implemented
SF0419 # 03 Y:2012 03 2012 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $1,176 $963 Not Implemented
SF0419 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,431 $16,162 Implemented
SF0419 # 05 Y:2012 05 2012 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $8,615 $42,287 Not Implemented
SF0419 # 06 Y:2012 06 2012 HEAT WATER WITH EXHAUST HEAT $5,628 $35,328 Not Implemented
SF0417 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,561 $0 Not Implemented
SF0417 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,459 $0 Implemented
SF0417 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $58 Not Implemented
SF0417 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,237 $239 Implemented
SF0417 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,829 $21,581 Not Implemented
SF0417 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,063 $2,490 Not Implemented
SF0417 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $6,916 $31,417 Implemented
SF0417 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,407 $16,180 Implemented
SF0418 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $40,533 $0 Implemented
SF0418 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,408 $0 Implemented
SF0418 # 03 Y:2012 03 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,193 $9,787 Not Implemented
SF0418 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,230 $15,467 Implemented
SF0418 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,301 $8,388 Implemented
SF0418 # 06 Y:2012 06 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,222 $0 Not Implemented
SF0418 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,705 $0 Not Implemented
SF0418 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $84 $107 Not Implemented
SF0418 # 09 Y:2012 09 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $0 $0 Not Implemented