Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
111
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0508 # 06 Y:2017 | 06 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,181 | $6,155 | Not Implemented |
SF0507 # 07 Y:2017 | 07 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $54,833 | $312,470 | Implemented |
SF0507 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,318 | $0 | Implemented |
SF0507 # 02 Y:2017 | 02 | 2017 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $7,895 | $560 | Implemented |
SF0507 # 03 Y:2017 | 03 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $1,567 | $156 | Implemented |
SF0507 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $8,398 | $3,902 | Implemented |
SF0507 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $116,456 | $172,681 | Implemented |
SF0507 # 06 Y:2017 | 06 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,369 | $12,526 | Implemented |
SF0506 # 07 Y:2017 | 07 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,791 | $21,455 | Not Implemented |
SF0506 # 06 Y:2017 | 06 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $2,157 | $5,830 | Not Implemented |
SF0506 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,187 | $14,341 | Not Implemented |
SF0506 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,033 | $4,499 | Implemented |
SF0506 # 02 Y:2017 | 02 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,881 | $728 | Implemented |
SF0506 # 01 Y:2017 | 01 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,307 | $0 | Implemented |
SF0506 # 08 Y:2017 | 08 | 2017 | ADOPT IN-HOUSE MATERIAL GENERATION | $74,931 | $224,896 | Not Implemented |
SF0506 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,722 | $46,373 | Implemented |
SF0505 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,675 | $28,219 | Not Implemented |
SF0505 # 01 Y:2017 | 01 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $23,294 | $4,639 | Not Implemented |
SF0505 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $486 | $86 | Not Implemented |
SF0505 # 03 Y:2017 | 03 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,070 | $1,651 | Not Implemented |
SF0505 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,325 | $6,323 | Not Implemented |
SF0505 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,816 | $6,103 | Not Implemented |
SF0505 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $3,828 | $5,423 | Implemented |
SF0505 # 08 Y:2017 | 08 | 2017 | INSULATE BARE EQUIPMENT | $1,069 | $1,882 | Implemented |
SF0503 # 03 Y:2017 | 03 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $802,468 | $1,600,000 | Implemented |