Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
236
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0034 # 04 Y:2025 | 04 | 2025 | USE POWER DURING OFF-PEAK PERIODS | $1,270 | $0 | n/a |
SJ0034 # 03 Y:2025 | 03 | 2025 | USE OPTIMUM TEMPERATURE | $3,458 | $0 | n/a |
SJ0034 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,631 | $10,962 | n/a |
SJ0034 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,541 | $106,228 | n/a |
SJ0033 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,132 | $39,246 | n/a |
SJ0033 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,071 | $384 | n/a |
SJ0033 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $123,902 | $507,150 | n/a |
SJ0033 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $0 | n/a |
SJ0033 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,035 | $0 | n/a |
SJ0033 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $39,875 | $0 | n/a |
SJ0033 # 08 Y:2025 | 08 | 2025 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $57,302 | $150,000 | n/a |
SJ0033 # 09 Y:2025 | 09 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,191 | $0 | n/a |
SJ0033 # 10 Y:2025 | 10 | 2025 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $88,611 | $0 | n/a |
SJ0033 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,984 | $316 | n/a |
SJ0032 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $400 | $297 | n/a |
SJ0032 # 01 Y:2025 | 01 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $129,492 | $206,023 | n/a |
SJ0032 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $869 | $0 | n/a |
SJ0032 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,156 | $2,349 | n/a |
SJ0032 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $123 | $0 | n/a |
SJ0032 # 04 Y:2025 | 04 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $5,400 | $34,907 | n/a |
SJ0031 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $61,665 | $21,632 | n/a |
SJ0031 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,602 | $4,651 | n/a |
SJ0031 # 04 Y:2025 | 04 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $11,204 | $2,890 | n/a |
SJ0031 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $25,779 | $0 | n/a |
SJ0030 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,245 | $0 | n/a |