IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

755

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0035 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $177 $285 Not Implemented
ST0035 # 07 Y:1985 07 1985 COVER OPEN TANKS $475 $400 Not Implemented
ST0035 # 08 Y:1985 08 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $433 $700 Not Implemented
ST0035 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,520 $537 Not Implemented
ST0035 # 10 Y:1985 10 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $3,918 $3,089 Not Implemented
ST0035 # 11 Y:1985 11 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,508 $350 Not Implemented
ST0035 # 12 Y:1985 12 1985 REDUCE GLAZED AREAS IN BUILDINGS $1,130 $4,848 Not Implemented
ST0035 # 13 Y:1985 13 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $9,670 $136 Not Implemented
ST0035 # 14 Y:1985 14 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,586 $3,500 Implemented
ST0036 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,879 $20,400 Not Implemented
ST0036 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,064 $56 Implemented
ST0036 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,767 $0 Implemented
ST0036 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $197 $340 Implemented
ST0036 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $420 $200 Implemented
ST0036 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $99,880 $200,000 Not Implemented
ST0036 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $320 $160 Implemented
ST0036 # 08 Y:1985 08 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $792 $1,680 Implemented
ST0037 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,504 $858 Not Implemented
ST0037 # 02 Y:1985 02 1985 UPGRADE OBSOLETE EQUIPMENT $43,200 $19,000 Not Implemented
ST0037 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $502 $300 Not Implemented
ST0037 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $64 Implemented
ST0037 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $266 $0 Implemented
ST0037 # 06 Y:1985 06 1985 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,243 $1,200 Not Implemented
ST0037 # 07 Y:1985 07 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $275 $410 Implemented
ST0037 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,124 $2,000 Implemented