Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
755
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0022 # 10 Y:1985 | 10 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,680 | $5,600 | Not Implemented |
ST0022 # 11 Y:1985 | 11 | 1985 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $767 | $5 | Implemented |
ST0023 # 01 Y:1985 | 01 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $1,091 | $125 | Implemented |
ST0023 # 02 Y:1985 | 02 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $8,365 | $26,400 | Not Implemented |
ST0023 # 03 Y:1985 | 03 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,753 | $0 | Implemented |
ST0023 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,538 | $6,448 | Implemented |
ST0023 # 05 Y:1985 | 05 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,180 | $96 | Implemented |
ST0023 # 06 Y:1985 | 06 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $266 | $182 | Not Implemented |
ST0023 # 07 Y:1985 | 07 | 1985 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $55,176 | $50,000 | Not Implemented |
ST0023 # 08 Y:1985 | 08 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,472 | $0 | Implemented |
ST0023 # 09 Y:1985 | 09 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $738 | $2,000 | Implemented |
ST0023 # 10 Y:1985 | 10 | 1985 | USE COMPRESSOR AIR FILTERS | $479 | $120 | Implemented |
ST0024 # 01 Y:1985 | 01 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $196 | $0 | Implemented |
ST0024 # 02 Y:1985 | 02 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $65 | $95 | Not Implemented |
ST0024 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,844 | $1,600 | Not Implemented |
ST0024 # 04 Y:1985 | 04 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $893 | $112 | Implemented |
ST0024 # 05 Y:1985 | 05 | 1985 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $2,549 | $3,000 | Not Implemented |
ST0024 # 06 Y:1985 | 06 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $200 | $2,550 | Not Implemented |
ST0024 # 07 Y:1985 | 07 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,678 | $0 | Implemented |
ST0024 # 08 Y:1985 | 08 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,190 | $1,428 | Not Implemented |
ST0024 # 09 Y:1985 | 09 | 1985 | INSULATE BARE EQUIPMENT | $44 | $26 | Implemented |
ST0024 # 10 Y:1985 | 10 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,186 | $1,900 | Implemented |
ST0024 # 11 Y:1985 | 11 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,038 | $2,186 | Implemented |
ST0024 # 12 Y:1985 | 12 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,820 | $0 | Not Implemented |
ST0024 # 13 Y:1985 | 13 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,126 | $76 | Implemented |