Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,794
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0107 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $410 | $390 | Implemented |
SU0107 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $170 | $59 | Implemented |
SU0107 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $50 | $20 | Implemented |
SU0107 # 05 Y:2001 | 05 | 2001 | PAY UTILITY BILLS ON TIME | $44 | $0 | Implemented |
SU0122 # 01 Y:2001 | 01 | 2001 | USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING | $18,489 | $0 | Not Implemented |
SU0122 # 02 Y:2001 | 02 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,468 | $0 | Not Implemented |
SU0122 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $486 | $0 | Not Implemented |
SU0122 # 04 Y:2001 | 04 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $15,879 | $0 | Not Implemented |
SU0122 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $38 | $0 | Not Implemented |
SU0119 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,410 | $0 | Not Implemented |
SU0119 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $930 | $0 | Implemented |
SU0119 # 03 Y:2001 | 03 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,956 | $4,900 | Implemented |
SU0119 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,095 | $727 | Implemented |
SU0119 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $30,661 | $208,950 | Not Implemented |
SU0119 # 06 Y:2001 | 06 | 2001 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $46,417 | $15,500 | Not Implemented |
SU0119 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $2,456 | $0 | Implemented |
SU0104 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $92 | $0 | Implemented |
SU0104 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $147 | $0 | Implemented |
SU0104 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,030 | $4,460 | Implemented |
SU0104 # 04 Y:2001 | 04 | 2001 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $8,614 | $20,500 | Not Implemented |
SU0104 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $30 | $79 | Not Implemented |
SU0121 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,756 | $450 | Not Implemented |
SU0121 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $508 | $945 | Implemented |
SU0121 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $1,001 | $69 | Implemented |
SU0121 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,452 | $0 | Implemented |