IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0090 # 05 Y:2004 05 2004 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,920 $120 Not Implemented
TA0090 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $910 $8 Not Implemented
TA0090 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $120 Implemented
TA0090 # 01 Y:2004 01 2004 $91,320 $20,000 Not Implemented
TA0090 # 04 Y:2004 04 2004 $2,350 $0 Not Implemented
TA0090 # 03 Y:2004 03 2004 $23,490 $45,000 Not Implemented
TA0090 # 02 Y:2004 02 2004 $42,810 $64,000 Not Implemented
TA0089 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $10,000 $3,200 Implemented
TA0089 # 04 Y:2004 04 2004 USE MINIMUM SAFE OVEN VENTILATION $1,890 $1,500 Implemented
TA0089 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,740 $0 Implemented
TA0089 # 01 Y:2004 01 2004 MOVE BOILER TO MORE EFFICIENT LOCATION $87,420 $4,860 Implemented
TA0089 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,060 $540 Implemented
TA0086 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,950 $5,000 Not Implemented
TA0086 # 05 Y:2004 05 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,605 $2,000 Not Implemented
TA0086 # 04 Y:2004 04 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,350 $0 Not Implemented
TA0086 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,742 $0 Not Implemented
TA0086 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,520 $5,800 Not Implemented
TA0088 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $66,520 $1,010 Implemented
TA0088 # 05 Y:2004 05 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $15,810 $2,000 Implemented
TA0088 # 02 Y:2004 02 2004 USE OPTIMUM THICKNESS INSULATION $86,400 $1,610 Not Implemented
TA0088 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $20,580 $15,340 Not Implemented
TA0088 # 08 Y:2004 08 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,000 $0 Not Implemented
TA0088 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,995 $1,000 Implemented
TA0088 # 06 Y:2004 06 2004 REDUCE OR ELIMINATE WASTE $18,000 $1,000 Implemented
TA0088 # 01 Y:2004 01 2004 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $146,590 $20,000 Implemented